Accounting for construction: 5 tips & best practices

This method should be used if revenues and costs of a project can be accurately estimated and all parties involved are expected to be able to complete all of their respective duties. From a technical level, WIP is a noncurrent asset account where long-term, fixed...

Accounting for construction: 5 tips & best practices

This method should be used if revenues and costs of a project can be accurately estimated and all parties involved are expected to be able to complete all of their respective duties. From a technical level, WIP is a noncurrent asset account where long-term, fixed...